| BRAND |
CATALOGUE |
| BULLDOZER |
D20, D30, D31, D37, D40, D41, D45, D50, D60, D65, D68, D75, D80, D85, D150, D155, D275, D355, D3C, D3D, D4C, D4D, D4H, D5, D6C, D6D, D6H, D7G, D8K, D8N, D9N, D10N, D11N |
| PC SERIES |
PC30, PC40, PC45, PC60, PC75, PC100, PC120, PC150, PC200, PC220, PC300, PC350, PC400 |
| CATER |
E70B, E110, E120B, E215, E235, E307, E311, E312, E322, E180, E240, E200B, E320, E300, E300B, E330, E325 |
| EX SERIES |
EX30, EX40, EX60, EX100, EX120, EX200, EX220, EX270, EX300, EX400, EX600, UH043, UH052, UH053, UH07, UH081, UH082, UH083, FH120, FH130, FH150, FH200, FH220, FH270, FH300 |
| VO-LVO |
EC55, EC130, EC150, EC200, EC210, EC240, EC290, EC360 |
| DAEWOO |
DH55, DH200, DH220, DH280 |
| HYUNDAI |
R55, R60, R70, R80, R110, R130, R150, R200 |
| KATO |
HD140, HD250, HD400, HD450, HD550, HD700, HD820, HD850, HD880, HD900, HD1220, HD1250 |
| KOBELCO |
SK40, SK60, SK100, SK120, SK200, SK220, SK04-2, SK07, SK07N2, SK09, SK12, SK14, SK300, SK310, SK400 |
| JCB |
JS70, JS75, JS110, JS130, JS160, JS180, JS200, JS220, JS240, JS260, JS300, JS330 |
| SUMITOMO |
SH70, SH100, SH120, SH160, SH200, SH260, SH265, SH280, SH300, SH340, LS2650, LS2800, LS3400, LS4300, MX8, SE200, SE210, SE280, MX292, SE350 |
| MITSUBISHI |
MS110, MS120, MS140, MS180 |
Secure machine support, cross-tightening in sequence, use of new Class 12.9 bolts + thread locker, re-tightening to standard torque, and test inspection after installation.
1. Preparations (Safety First)
Park the excavator on firm, level ground; fully extend and stabilize the outriggers, shut off the engine, disconnect power, and lock the travel control levers. Jack up one side of the track and support it securely with safety stands or wooden blocks. Release grease from the track tension cylinder to slacken the track and disengage it from the drive sprocket, creating sufficient working space.
Class 12.9 high-strength bolts (brand new in the same specification; reuse of old bolts is strictly prohibited), medium-to-high strength thread locker (242/271), torque wrench, pneumatic impact wrench, tap, cleaner, wire brush, pry bar, brass hammer.
Clean the travel motor flange and ring gear mounting surface to remove oil, rust, and burrs. Use a tap to restore damaged threaded holes to ensure they are free of defects and contaminants.
Standard delivery takes 10-20 days depending on quantity. Urgent orders can be accommodated upon request.
We are a manufacturer with over 20 years of production experience. Our trading subsidiary handles international operations.
Yes, samples are available with prepayment of sample and freight costs, refundable upon order placement.
All products undergo strict testing procedures and must pass 100% quality inspection before shipment.
We accept T/T, D/A, D/P, L/C, O/A and other preferred payment methods before shipment.
Excavator Sprocket Bolt Manufacturer, Sprocket Bolt Manufacturer, sprocket bolt excavator, excavator sprocket bolt torque, excavator sprocket replacement