Quanzhou Nanfeng Machinery Manufacturing Co., Ltd.
Email: cai@nanfengmachinery.com TEL: 86--13655959125
Home > Products > Front Idler >
Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322
  • Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322
  • Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322
  • Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322
  • Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322

Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322

Place of Origin Fujian China
Brand Name NF
Certification ISO\CE\SGS
Model Number 20Y-30-00322
Product Details
Material:
51mn
Deepth:
8mm-12mm
Color:
Black, Yellow Or Customized
HS Code:
84314999
Warranty Time:
2000 Hour
Hardness Depth:
8-12mm
Highlight: 

front idler assy 20y-30-00322

,

20y-30-00322 undercarriage idler

,

cat pc200-7 undercarriage idler

Payment & Shipping Terms
Minimum Order Quantity
10 Piece
Packaging Details
Standard Export Wooden Package
Delivery Time
5-10 Days
Payment Terms
T/T,Western Union,MoneyGram
Supply Ability
13000 pieces per month
Product Description

Excavator Guide Idler for CAT PC200-7 Tractor Crawler Undercarriage Track Parts 20Y-30-00322

CAT PC200-7 Undercarriage Idler 20Y-30-00322 - High Efficiency for Brunei Projects

Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322 0

Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322 1

Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322 2

Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322 3

 

Product Catalogues
BULLDOZER
D20
D30
D31
D37
D40
D41
D45
D50
D60
D65
D68
D75
D80
D85
D150
D155
D275
D355
D3C
D3D
D4C
D4D
D4H
D5
D6C
D6D
D6H
D7G
D8K
D8N
D9N
D10N
D11N
 
 
 
KOMA-TSU
PC30
PC40
PC45
PC60
PC75
PC100
PC120
PC150
PC200
PC220
PC300
PC350
PC400
 
 
 
 
 
CATER-PILLAR
E70B
E110
E120B
E215
E235
E307
E311
E312
E322
E180
E240
E200B
E320
E300
E300B
E330
E325
 
HITACHI
EX30
EX40
EX60
EX100
EX120
EX200
EX220
EX270
EX300
EX400
EX600
UH043
UH052
UH53
UH07
UH081
UH082
UH083
FIAT-HITACHI
FH120
FH130
FH150
FH200
FH220
FH270
FH300
 
 
VO-LVO
EC55
EC130
EC150
EC200
EC210
EC240
EC290
EC360
 
DAEWOO
DH55
DH130
DH180
DH200
DH280
DH300
DH320
 
 
HYUNDAI
R60
R130
R200
R210
R220
R290
R320
R914
 
KATO
HD250
HD400
HD450
HD700
HD770
HD820
HD1250
 
 
KOBELCO
SK40
SK60
SK100
SK120
SK200
SK220
SK04-2
SK07
 
SK07N2
SK09
SK12
SK14
SK300
SK310
SK400
 
 
JCB
JS70
JS75
JS110
JS130
JS160
JS180
JS200
JS220
 
JS240
JS260
JS300
JS330
 
 
 
 
 
SUMITOMO
SH70
SH100
SH120
SH160
SH200
SH260
SH265
SH280
SH300
SH340
LS2650
LS2800
LS3400
LS4300
 
 
 
 
MITSUBISHI
MS110
MS120
MS140
MS180
 
 
 
 
 
 

 

Production Process of PC200 Excavator Idler Wheels

As a core traveling component of crawler excavators, the idler wheel of PC200 excavators must meet the working condition requirements of high strength and high wear resistance. Its production process covers multiple key links including raw material selection, forming and processing, heat treatment, assembly, and inspection, with the specific procedures as follows:
  1. Raw Material Procurement and Quality Inspection High-strength steel suitable for the application shall be selected for the core components (wheel body, bushing, and main shaft) of the idler wheel: the wheel body is generally made of high-hardenability cast steel (e.g., ZG35CrMo) or high-quality structural steel (e.g., 40Mn2); the bushing is mostly made of copper alloy or bimetallic composite material; the main shaft is made of alloy structural steel such as 42CrMo.
    After entering the factory, raw materials shall be subject to spectral analysis, hardness testing, flaw detection and other methods to verify whether the material composition and purity meet the design standards, and raw materials with defects such as sand holes, cracks, and slag inclusions shall be rejected.
  2. Wheel Body Forming and Processing The mainstream forming processes are divided into forging and casting, among which the forging process is more suitable for the PC200 idler wheels used in high-load working conditions:
    • Forging Process: Heat the steel billet to 1100–1200℃, and perform integral die forging forming by a die forging press, so as to densify the internal metal grains of the wheel body and improve its strength and fatigue resistance; after forging, conduct trimming and straightening to remove flash and burrs and ensure the dimensional accuracy of the wheel body shape.
    • Casting Process: Pour molten steel into the mold, and demold after cooling; however, castings are prone to internal air holes, so additional aging treatment is required to eliminate internal stress.
    Some manufacturers adopt the roll forging and welding process, i.e., first roll forging the rim and hub, then splicing them by welding, but the overall performance is weaker than that of integral forging.
  3. Precision Machining The formed wheel body shall be finish-machined by CNC equipment to ensure assembly accuracy:
    • Carry out turning and boring on the inner hole, mounting hole position and rim working surface of the wheel body to ensure that the roundness and coaxiality of the inner hole meet the tolerance requirements (usually the tolerance is controlled within ±0.05mm).
    • After quenching and tempering (quenching + high-temperature tempering) of the main shaft, perform turning and grinding to ensure the surface roughness and dimensional accuracy of the main shaft and improve the matching degree with the bushing.
    • The bushing shall be subject to boring and rolling to enhance the wear resistance of the inner wall.
  4. Key Heat Treatment Procedures Heat treatment is the core step determining the wear resistance of the idler wheel, mainly targeting the wheel body working surface and main shaft:
    • Wheel Body Surface Quenching: Adopt medium-frequency induction hardening technology to locally quench the working surface of the rim in contact with the crawler, so that the surface hardness reaches HRC58–62, and the core maintains toughness (HRC25–30) to avoid wear and edge chipping during operation.
    • Low-temperature Tempering: Conduct low-temperature tempering at 180–220℃ after quenching to eliminate quenching stress and prevent wheel body cracking.
    • Main Shaft Heat Treatment: After quenching and tempering, the surface hardness of the main shaft can reach HRC28–32, which has both strength and toughness to meet the load-bearing requirements.
  5. Sealing and Bearing Assembly
    • First, press-fit the processed bushing into the inner hole of the wheel body to ensure a firm interference fit without loosening.
    • Install the sealing assembly: The PC200 idler wheel mostly adopts a double-seal structure of double-lip seal ring + labyrinth seal. Insert the seal ring into the sealing groove of the wheel body to prevent sand, mud and water vapor from invading the internal bearings.
    • Press-fit the main shaft, inject lithium-based grease to ensure the lubrication effect when the bearing rotates; finally assemble the end cover to complete the overall assembly.
  6. Finished Product Inspection and Factory Delivery After assembly, the product shall undergo multi-dimensional inspection before leaving the factory:
    • Dimensional Inspection: Use calipers, micrometers, coordinate measuring machines to detect the outer diameter of the wheel body, inner hole size and mounting hole spacing to ensure compatibility with the chassis of PC200 excavators.
    • Performance Testing: Manually rotate the idler wheel to test its rotation flexibility, which is qualified if there is no jamming or abnormal noise; conduct hydraulic pressure sealing test to verify the sealing performance and prevent oil leakage.
    • Non-destructive Testing: Detect hidden cracks inside the wheel body and main shaft through magnetic particle inspection or ultrasonic flaw detection.
    • Coating and Rust Prevention: After passing the inspection, perform shot blasting derusting on the surface of the idler wheel, then spray anti-rust primer and special topcoat for engineering machinery, and mark the specifications, models and production batch numbers.
FAQ
 
Q: What main products do you supply?
A: Track roller/Carrier roller/ Sprocket/ Segment/ Front idler/ Track shoe/ track chain/ Bolt/ Nut/ Pin/ Bushing/ Seal and gasket/ Filter/ Bucket teeth/ Bucket/ adaptor and other spare parts.
 
Q: How is your quality?
A: OEM Quality: all products size following OEM strictly. The quality is absolutely guaranteed,
if there are problems related to quality, please tell us, we will do our best to make you satisfied.
 
Q: What is your delivery time?
A: Generally, If we have your required items in stock, delivery time 7-10 days.
Or if your required items out of stock, delivery time need about 15days.
The actual delivery time depends on the items and the quantity of your order.
 
Q: What is your sample policy?
A: We accept a trial sample order if ready parts in stock.
You are welcome to send us samples or spec. Drawing. We can build new mould and produce products accordingly.
 
Q: How to make payment?
A: We accept multiple payment methods: Bank transfer T/T, Paypal, L/C at sight and so on.
Payment<=3000usd, 100="" />Payment>=3000USD, 30% T/T in advance , the balance before shipment.
 
Q: How to track the goods if order shipped?
A: We will inform you the shipping information after your order is sent out.
Express shipment: we will send you express tracking number.
Air shipment: we will send you AWB, Packing list and Commercial invoice and other necessary documents.
Sea shipment: we will send you BL, Packing list and Commercial invoice and other necessary documents.
 
Q: Which countries have you ever exported to?
A: Our products have been exported to more than 60 countries such as USA, UK, Germany, Russia, UAE, Indonesia, Malaysia, Thailand, Sri Lanka, INDIA, Pakistan, Bangladesh, South Africa, Colombia, Peru and etc.
Contact Information
WhatsApp: +375 (25) 660-12-83
WeChat: +86 13655959125 / 15860377809
 
20Y-30-00322,Excavator Guide Idler,Tractor Crawler Undercarriage Track Parts,CAT PC200-7 Excavator Idler,Tractor Crawler Guide Idler

 

Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322 4

Excavator Guide Undercarriage Idler For CAT PC200-7 Tractor Crawler Front Idler Assy 20Y-30-00322 5

 

 

Contact Us at Any Time

13655959125
No. 506, Zikeng, Si Huang Village, Xiamei Town, Nan'an City, Quanzhou City, Fujian Province, China
Send your inquiry directly to us